Small hydro power plant of Moutier "Tunnel du Graitery"
   
Object Low head small power plant
Location Moutier, Switzerland
Water streams Tunnel water
Owners Turbinor SA, Sonceboz (CH) and Bleue-Verte SA, Moutier (CH). Joint venture culnu with 50/50% shares
   
Project status: Project completed
   
Concept:  
Intake Including a small water storage basin with a flushing gate valve, an overflow crest with a bypass, a screen with multiple holes (without automatic cleaning machine)
Penstock Penstock built in HDPE DN 355/PN10; pipe elements of 12 m each and elbows thermo-welded together or by means of using an electrical welding sleeve. Total penstock length is 293 m
Powerhouse 1x Horizontal Pelton turbine with two jets, runner dia. 500 mm [HYDROHROM HHP H2]. Asynchronous generator 400 V, 75 kW, 612 rpm [Siemens] directly coupled to the turbine
Tailrace Underground metal pipe of dia. 800 mm. Installation by means of successive hammering (tube pusher) and welding together of 5 m pipe elements on a total length of 46 m
   
Characteristics:  
Gross head 56.5 m
Nominal turbine flow 160 l/s
Nominal power 66 kW
Yearly production 235 MWh
   
Realization:  
Construction start April 2015
Commercial operation September 2015
   
Engineering office EnEn Sàrl, Moutier (CH)
Civil engineering office ATB SA, Moutier (CH)
Civil works F. Hänzi, Moutier (CH)
Construction company F. Hänzi, Moutier (CH)
Tube pusher company Dell'Anna Enzo SA, Moutier (CH)
Supplier of the penstock PlastiteCH, Eysins (CH)
Supplier of the turbine equipment Hydrohrom s.r.o. Bystrice (CZ)
 
Das Kleinkraftwerk / La Petite Centrale No.87 1/2016
Wasserkraft & Energie 2/2016
 
 
 

 Reference list of all engineering activities on request!